Epoxy Guides

Find the guide for the decision in front of you, then use the matching calculator to run your own numbers.

Floors and coatings

Choosing a coating, pricing it, and getting it down on garage and basement floors.

Polyaspartic costs $5 – $12 per sq ft installed against $4 – $10 for epoxy. Compare cure time, yellowing, working time, and which suits your garage.

The real pros and cons of epoxy flooring: how long it lasts, why it peels or yellows, what it costs per year, and when another floor is the better choice.

How to epoxy a garage floor step by step: moisture test, grinding, mixing, coating, and cure times by temperature, with a timeline and a materials list.

A basement epoxy floor costs about $4 – $10 per sq ft installed, plus around $1 per sq ft for a vapor barrier. See prices by size and test the slab first.

Epoxy floors run from about 3 dry mils per coat for water-based kits to 1/4 inch for mortar. Thickness by system in mils and mm, wet vs dry film, and what each floor needs.

Compare seal coat and flood coat epoxy layers, when to calculate them separately, and how they affect resin quantity, bubbles, and coverage.

How much epoxy you need

Coverage rules, formulas, and allowances to check before you buy.

Learn how to calculate epoxy needs by volume, coverage, thickness, and waste, then use the right calculator for your project.

Learn how much epoxy is needed per square foot at common coat thicknesses and when to use a coverage calculator.

How thick is epoxy? Typical thickness for garage floors (10-20 mils), tabletops (1/8 inch), and deep pours, plus square feet per gallon at every thickness.

Learn the epoxy pour calculation workflow: choose shape, measure dimensions, convert volume, add waste, check depth, and match kit size.

Learn how much extra epoxy to buy for waste, seepage, edge soak-in, mixing loss, and irregular project geometry.

Choose epoxy kit size after calculating project quantity, waste, Part A/B split, unit conversion, and product-specific limits.

River tables and deep pours

Measuring, choosing a resin, layer depth, and stopping leaks.

Compare deep pour and table top epoxy by thickness, cure behavior, use case, and project fit for river tables, slabs, and coatings.

Choose epoxy pour depth, layer strategy, and resin type for surface coats, river tables, deep pours, molds, and casting projects.

Understand maximum epoxy pour depth, resin type, exotherm, project volume, layer planning, and why manufacturer limits matter.

Prevent epoxy leaks in river tables, molds, live-edge slabs, cracks, and seal coat projects before mixing resin.

Mix ratios

Splitting Part A and Part B correctly, by volume or by weight.

How to split epoxy resin and hardener at 1:1, 2:1, and 3:1 in ounces and milliliters, when to measure by weight, and what happens if the ratio is off.

Understand when epoxy mix ratio should be measured by volume or by weight, and why manufacturer instructions override generic ratio calculators.

Project costs

Material budgets for tables, countertops, and bar tops.

Estimate river table epoxy cost by resin quantity, deep-pour needs, waste, seepage, seal coat, kit size, and price per gallon.

Plan epoxy countertop material cost from surface area, flood coat thickness, edges, waste, kit size, and price per gallon.

Estimate epoxy bar top material cost by surface area, flood coat thickness, edge runoff, seal coat, waste, and kit price.